Ambassador Bridge inspection area scheduled for expansion

DETROIT (Feb. 26, 2001) — The inspection facilities at the Ambassador Bridge between Detroit and Canada are scheduled to get a $36 million US expansion.

The initiative, which is expected to help reduce backups at North America’s busiest border crossing, will expand the number of truck inspection booths from seven to 10 and adding 22,000 square feet of office space, the Detroit News reported. It will also more than double the amount of truck parking from the current 80 spots.

Congress still needs to appropriate much of the money for the expansion project, but officials hope construction could begin as early as late this summer. It is a top priority for the U.S. Customer Service.

In addition, the company that owns the 71-year-old bridge is working on its own multi-million dollar project. By the end of April, the paper reports, the Detroit International Bridge Co. will reverse toll payments so those traveling from Canada to the United States will pay on the American side of the bridge, rather than the Canadian side. That will allow trucks to build up more speed when the cross the bridge’s steep incline.

The Michigan Department of Transportation’s plan to connect the bridge directly to the Interstate highway system is behind schedule. Construction to directly connect I-75 and I-96 to the bridge was scheduled to begin in 2002 and be finished in 2005, but the state has not finalized the division of the costs with the privately owned Bridge Company.

Source: truckinginfo.com


Have your say


This is a moderated forum. Comments will no longer be published unless they are accompanied by a first and last name and a verifiable email address. (Today's Trucking will not publish or share the email address.) Profane language and content deemed to be libelous, racist, or threatening in nature will not be published under any circumstances.

*